Results

Presentation Materials

Deliverables

Policy Assessment report

Policy Assessment report with the policy and legislation assessment and contact with administrations (D2.1).

BIODAPH Reactor Setup, Operation, and Monitoring Guidelines

Guidelines for setting-up and operating the BIODAPH reactor (design, construction, operation, testing and optimization), as well as the monitoring requirements to assess its efficiency

Pictures, schemes and maps of the demo-plant

Graphic report with pictures, schemes and maps of the two demo-plants (Spanish-site and Greek-site) and their main characteristics (D3.3).

Assessment of Demonstration Plants over Three Periods

Results from the assessment of the demonstration plants in three different periods: after the first six first months (D4.1), after the BIODAPH demonstration plants optimized in each site (D4.2), and after long time operation at optimal conditions (D4.3).

Sustainability assessment reports

Sustainability assessment reports (D4.4 – Environmental impact assessment (LCA) and Techno-economic assessment (LCC) Intermediate report and D4.5 – LCA and LCC assessment final report).

BIODAPH Impact on the river ecosystem

Impact of the BIODAPH on the ecological and chemical status of the river ecosystem after action (D4.6).

BIODAPH impact on agricultural reclaimed water

Impact of BIODAPH reclaimed water on the agricultural productivity and quality after action (D4.7)

Reports of key indicators

Reports of key indicators collected in a matrix concerning the performance of the project (D4.8 & D4.9).

Dissemination Plan & websites

Dissemination Plan, document describing a thorough plan for all dissemination activities of the project and providing dissemination guidelines to be followed by all partners (D5.1), and websites (D5.2).

BIODAPH2O manual and guidelines

BIODAPH2O manual and guidelines with data sheet of design to implement the technology full-scale (D6.2).