Policy Assessment report with the policy and legislation assessment and contact with administrations (D2.1).
Guidelines for setting-up and operating the BIODAPH reactor (design, construction, operation, testing and optimization), as well as the monitoring requirements to assess its efficiency
Graphic report with pictures, schemes and maps of the two demo-plants (Spanish-site and Greek-site) and their main characteristics (D3.3).
Results from the assessment of the demonstration plants in three different periods: after the first six first months (D4.1), after the BIODAPH demonstration plants optimized in each site (D4.2), and after long time operation at optimal conditions (D4.3).
Sustainability assessment reports (D4.4 – Environmental impact assessment (LCA) and Techno-economic assessment (LCC) Intermediate report and D4.5 – LCA and LCC assessment final report).
Impact of the BIODAPH on the ecological and chemical status of the river ecosystem after action (D4.6).
Impact of BIODAPH reclaimed water on the agricultural productivity and quality after action (D4.7)
Reports of key indicators collected in a matrix concerning the performance of the project (D4.8 & D4.9).
BIODAPH2O manual and guidelines with data sheet of design to implement the technology full-scale (D6.2).